Users Online Now:
2,714
(
Who's On?
)
Visitors Today:
700,005
Pageviews Today:
1,269,242
Threads Today:
551
Posts Today:
8,812
11:21 AM
Join Our:
Twitter
-
YouTube
-
Podcasts
Donate To GLP
Directory
Adv. Search
Topics
Forum
Back to Forum
Back to Thread
REPLY TO THREAD
Subject
New Tepco admission “contradicts everything the company has maintained so far”
User Name
Font color:
Default
Dark Red
Red
Orange
Brown
Yellow
Green
Olive
Cyan
Blue
Dark Blue
Indigo
Violet
Black
Font:
Default
Verdana
Tahoma
Ms Sans Serif
In accordance with industry accepted best practices we ask that users limit their copy / paste of copyrighted material to the relevant portions of the article you wish to discuss and no more than 50% of the source material, provide a link back to the original article and provide your original comments / criticism in your post with the article.
[quote:Anonymous Coward 25430863:MV8yMDE1OTc2XzMzODc1Nzc4Xzk2NEJBRjhF] [quote:Waterbug:MV8yMDE0OTk4XzMzODc1NTYxXzY0MjEzMDM1] [quote:Waterbug:MV8yMDE1MjczXzMzODY4NzI5X0M0OEFGNTdB] Arrogant negligence. Complete disregard for public safety. http://en.wikipedia.org/wiki/Fukushima_Daiichi_nuclear_disaster [snip] Fukushima-Daiichi Safety history 1967: Changing the layout of the emergency-cooling system, without reporting it Fukushima reactor control room. On 27 February 2012, NISA ordered TEPCO to report by 12 March 2012 about [b]the reasoning to change the layout for the piping for an emergency cooling system from the plans [/b]originally registered in 1966 before the reactor was taken in operation. After the plant was hit by the tsunami, the isolation condenser should have taken over the function of the ordinary cooling pumps, by condensing the steam from the pressure vessel into water to be used for cooling the reactor. [b]But the condenser did not function properly, and TEPCO could not confirm whether a valve was opened.[/b] In the original papers submitted – in July 1966 – for government approval of the plans to set up the reactor, the piping systems for two units in the isolation condenser were separated from each other. But in the application for the construction plan of the reactor – submitted in October 1967 – the piping layout was changed by TEPCO, and the two piping systems were connected outside the reactor. [b][b]The changes were not reported in violation of all legal regulations.[/b][/b] 1976: Falsification of safety records by TEPCO The Fukushima Daiichi nuclear power complex was central to a falsified-records scandal that led to the departure of a number of senior executives of TEPCO. [b]It also led to disclosures of previously unreported problems at the plant,[53] although testimony by Dale Bridenbaugh, a lead GE designer, purports that General Electric was warned of major design flaws in 1976, resulting in the resignations of several designers who protested GE's negligence.[/b][54][55][56] 2002: [b] TEPCO admitted it had falsified safety records at the No. 1 reactor at Fukushima Daiichi.[/b] As a result of the scandal and a fuel leak at Fukushima Daini, the company had to shut down all of its 17 nuclear reactors to take responsibility.[57] A power board distributing electricity to a reactor's temperature control valves was not examined for 11 years.[b] Inspections did not cover devices related to cooling systems, such as water pump motors and diesel generators.[[/b]58] 1991: Back-up generator of reactor nr. 1 flooded [b][b][color=red]On 30 October 1991, one of two backup generators of reactor nr. 1 did fail, after it was flooded in the basement of the reactor buildings.[/color][/b] [/b]Seawater used for the cooling of the reactor was leaking into the turbine-building from a corroded pipe at a rate of 20 cubic meters per hour. This was told by former TEPCO employees to the Japan Broadcasting Corporation news-service in December 2011. [b]An engineer told, that he informed his superiors about this accident, and that he mentioned the possibility that a tsunami could inflict damage to the generators in the turbine-buildings near the sea.[color=red] After this, TEPCO did not move the generators to higher grounds,[/color] but instead, TEPCO installed doors to prevent water leaking into the generator rooms. [/b]The Japanese Nuclear Safety Commission commented that it would revise the safety guidelines for designing nuclear plants and would enforce the installation of additional power sources. On 29 December 2011, TEPCO admitted all these facts: its report mentioned, that the emergency power system room was flooded through a door and some holes for cables, but the power supply to the reactor was not cut off by the flooding, and the reactor was stopped for one day. One of the two power sources was completely submerged, but its drive mechanism had remained unaffected.[59][60][61] 2006: The Japanese government opposes a court-order [color=red]In March 2006, the Japanese government opposed a court order to close a nuclear plant in the west part of the country over doubts about its ability to withstand an earthquake.[/color] Japan's Nuclear and Industrial Safety Agency believed it was "safe" and that "all safety analyses were appropriately conducted".[62] 2007: Tsunami-study ignored In 2007, TEPCO did set up a department to supervise all its nuclear facilities, and until June 2011 its chairman was Masao Yoshida, the chief of the Fukushima Daiichi power plant.[b] An in-house study in 2008 pointed out that there was an immediate need to improve the protection of the power station from flooding by seawater. This study mentioned the possibility of tsunami-waves up to 10.2 meters. [color=red]Officials of the department at the company's headquarters insisted that such a risk was unrealistic and did not take the prediction seriously[/color].[/b][63] 2008: Seismic-concerns In addition to concerns from within Japan, the International Atomic Energy Agency (IAEA) has also expressed concern about the ability of Japan's nuclear plants to withstand seismic activity. [b]At a meeting of the G8's Nuclear Safety and Security Group, held in Tokyo in 2008, [color=red]an IAEA expert warned that a strong earthquake with a magnitude above 7.0 could pose a "serious problem" for Japan's nuclear power stations.[/color][/b][64 [/quote] [/quote] [/quote]
Original Message
Al Jazeera , Oct 12, 2012: “It’s an admission that contradicts everything the company has maintained so far, that Japan’s nuclear disaster could actually have been avoided.”
[
link to www.youtube.com
]
Pictures (click to insert)
General
Politics
Bananas
People
Potentially Offensive
Emotions
Big Round Smilies
Aliens and Space
Friendship & Love
Textual
Doom
Misc Small Smilies
Religion
Love
Random
View All Categories
|
Next Page >>
News
HERE COMES INITIAL JOBLESS CLAIMS.
America Is Turning Into ‘Blade Runner With Food Stamps’
Mainstream Media Coverage of the Bilderberg Group Adopts a Tone of Desperation
Many corn farmers go back to using chemicals as Mother Nature outwits genetically modified seeds
Farms are great places to find pork. Apparently, so is the Farm Bill
African Coins Found In Australia: 1,000-Year-Old Discovery May Rewrite Country's History
The war against the organic [food] mafia
Man ‘Controlled By Satellites’ Makes 100 Calls To 911 In A Month, Vows To Continue
Five US States Help Boost US Oil Production
The Honeymoon is Over: Half of Americans Want to See Obama Impeached.
Smart rifle decides when to shoot, hardly ever misses target
NASA to build 'universal food synthesizer' 3D printer to boldly make pizza from insects and algae!
Food Shift Away From Waste
MasterCard Leading the Path Toward “A World Beyond Cash”
Facebook becomes member of Internet freedom group
MONSANTO is now the owner of BLACKWATER
"Form OBMA" Added to Tax Forms for 2014?
Could a Drug Prevent Brain Aging?
Marijuana: The Next Diabetes Drug?
First Human-Engineered ‘Meat Burger’ To Be Consumed In London
DHS To Install Infrared Sensors Along ‘Entire Border Of The United States’
Ammo shortage continues across U.S.
3D-printable food? NASA wants a taste
US Treasury Secretary taps government retiree pension fund
U.S. Has Depleted Two Lake Eries' Worth Of Groundwater Since 1900