Godlike Productions - Discussion Forum
Users Online Now: 2,398 (Who's On?)Visitors Today: 2,003,163
Pageviews Today: 2,779,312Threads Today: 671Posts Today: 13,133
09:09 PM


Back to Forum
Back to Forum
Back to Thread
Back to Thread
REPLY TO THREAD
Subject TEPCO misled Diet panel, averted quake-damage inspection at Fukushima plant
User Name
 
 
Font color:  Font:








In accordance with industry accepted best practices we ask that users limit their copy / paste of copyrighted material to the relevant portions of the article you wish to discuss and no more than 50% of the source material, provide a link back to the original article and provide your original comments / criticism in your post with the article.
Original Message TEPCO misled Diet panel, averted quake-damage inspection at Fukushima plant
Tokyo Electric Power Co. misled a Diet investigation panel and cited “dreadfully high” radiation levels to effectively block an inspection for possible quake damage at the crippled Fukushima No. 1 nuclear plant.

“(TEPCO’s explanation) was absolutely false and seriously obstructed the investigation,” Mitsuhiko Tanaka, a former member of the now-disbanded Diet commission, said in a statement submitted to the chiefs of the two Diet chambers on Feb. 7.

Tanaka asked the Diet to inspect the No. 1 reactor building to see if isolation condensers--key safety components at nuclear plants--were damaged by the Great East Japan Earthquake of March 11, 2011.

If the emergency cooling system was damaged by the magnitude-9.0 earthquake, stricter quake-resistance standards would be required for nuclear power plants, further delaying the restarts of idled reactors around the country.

The isolation condensers stopped working soon after the earthquake struck, which is believed to have contributed to the early meltdown of the No. 1 reactor.

TEPCO has denied they were damaged by the quake.

Tanaka, a former reactor design engineer, was responsible for on-site inspections for the Fukushima Nuclear Accident Independent Investigation Commission.

He and other commission members planned to visit the plant on March 5-6 last year after receiving reports that subcontracted workers had seen water on the fourth floor of the No. 1 reactor building following the earthquake. Two tanks and piping were holding water for the isolation condensers.

But Tanaka gave up on that plan after TEPCO said the reactor building was pitch-black and dangerous to enter.

In reality, a cover over the building transmitted 10-16 percent of sunlight. It was also equipped with powerful mercury lamps.

Read the whole Story: [link to ajw.asahi.com]
Pictures (click to insert)
5ahidingiamwithranttomatowtf
bsflagIdol1hfbumpyodayeahsure
banana2burnitafros226rockonredface
pigchefabductwhateverpeacecool2tounge
 | Next Page >>





GLP