Users Online Now:
2,175
(
Who's On?
)
Visitors Today:
2,165,961
Pageviews Today:
3,009,729
Threads Today:
705
Posts Today:
14,246
10:43 PM
Directory
Adv. Search
Topics
Forum
Back to Forum
Back to Thread
REPLY TO THREAD
Subject
Pilgrim Nuclear Power Plant Shut Down. Lost Power In Blizzard.
User Name
Font color:
Default
Dark Red
Red
Orange
Brown
Yellow
Green
Olive
Cyan
Blue
Dark Blue
Indigo
Violet
Black
Font:
Default
Verdana
Tahoma
Ms Sans Serif
In accordance with industry accepted best practices we ask that users limit their copy / paste of copyrighted material to the relevant portions of the article you wish to discuss and no more than 50% of the source material, provide a link back to the original article and provide your original comments / criticism in your post with the article.
[quote:Ap0c@Lyp5e:MV8yMTMzMzUzXzM2MDEzMjc4XzI4QzIzMEFG] [quote:hatch battener 33993742:MV8yMTMzMzUzXzM2MDEzMjcyX0M4MTdEOUIx] Blimey! From the local nuclear watchdog group on structural defects in the Pilgrim plant- http://www.pilgrimwatch.org/struc5.html Lack of Quality Assurance for Fuel Pool Cooling System during LOCA/LOOP In 1992, a study at the Susquehanna NPS by David Lockbaum and Donald Prevatte concluded that there is a major meltdown risk that is generic to boiling water reactor’s, Like Pilgrim (David Lockbaum, Nuclear Waste Disposal Crisis, PennWell Books, Tulsa, Oklahoma 1996). [b]The design flaw can occur in the event of an accident or the loss of off-site power. Pilgrim NPS is on the coast and loss of off-site power is a concern. Although there are backup diesel generators to protect a reactors cooling system if power is lost, there are no such diesel backups for a reactor’s used fuel pool[/b]; and all back-up generators may be inoperable - as was the case at Seabrook Station. During a LOCA, the normal cooling system would be useless because it runs on electricity. Activating the backup system manually would expose plant workers to fatal levels of radiation. The fix is expensive and time consuming. It has not happened. :hiding: [/quote] :bunnyomfg: [/quote]
Original Message
Pilgrim shut down because of loss of power. 3000 spent fuel rods on site.
Possible flooding impact also.
Here we go.
Pictures (click to insert)
General
Politics
Bananas
People
Potentially Offensive
Emotions
Big Round Smilies
Aliens and Space
Friendship & Love
Textual
Doom
Misc Small Smilies
Religion
Love
Random
View All Categories
|
Next Page >>