Godlike Productions - Conspiracy Forum
Users Online Now: 1,794 (Who's On?)Visitors Today: 705,236
Pageviews Today: 904,871Threads Today: 206Posts Today: 3,721
07:19 AM


Back to Forum
Back to Forum
Back to Thread
Back to Thread
REPORT ABUSIVE REPLY
Message Subject *** Fukushima *** and other nuclear-----updates and links
Poster Handle Waterbug
Post Content
Reactor is shut down at Comanche Peak nuclear plant
[link to www.star-telegram.com]

[snip]

One of the two reactors at the Comanche Peak nuclear power plant near Glen Rose was shut down early Friday after a cooling pump overheated, the operator reported.

According to an event report filed with the Nuclear Regulatory Commission, Unit 1 was shut down manually at 1:42 a.m. because of "high temperature indications" in a motor bearing on one of four huge pumps that circulate cooling water around the reactor.

An alarm that warns of an improper level of oil for the pump also sounded, the report stated.

The Unit 1 reactor also experienced an unusual event Wednesday morning when a backup generator started unexpectedly. According to an NRC event report, a faulty power supply "was identified and further investigation/calibration will determine if other conditions contributed to the fault."
 
Please verify you're human:




Reason for reporting:



News