Godlike Productions - Conspiracy Forum
Users Online Now: 1,512 (Who's On?)Visitors Today: 223,940
Pageviews Today: 292,287Threads Today: 58Posts Today: 1,579
02:10 AM


Back to Forum
Back to Forum
Back to Thread
Back to Thread
REPORT ABUSIVE REPLY
Message Subject *** Fukushima *** and other nuclear-----updates and links
Poster Handle Southern OR
Post Content
Corrosion At Fukushima Daiichi Explained

December 2nd, 2012 | Add a Comment
[Translate]

A very critical factor in the aftermath of the nuclear meltdowns at Fukushima is stress and corrosion on metal parts of the reactors themselves and also the spent fuel and fuel pools. In this paper we look at corrosion factors and also the actual pipes in use at Daiichi for the ongoing watering effort.
--snip--

Summary

TEPCO faces a major challenge to keep these existing pipes clear and working for the next 10 years. We did not find any records of these pipes being replaced at units 1-3 at Fukushima Daiichi NPP. The feedwater and core spray rings inside the reactors were replaced as part of the shroud replacement work that was done at units 1-3 between 1997 and 2001. (4) The pipes are about 42 years old and have suffered the extreme conditions of the triple meltdown accident. TEPCO has not proposed any plan for dealing with this issue.


--end snip--
[link to www.simplyinfo.org]
 
Please verify you're human:




Reason for reporting:



News