Godlike Productions - Conspiracy Forum
Users Online Now: 2,861 (Who's On?)Visitors Today: 962,179
Pageviews Today: 1,345,603Threads Today: 436Posts Today: 6,353
10:34 AM


Back to Forum
Back to Forum
Back to Thread
Back to Thread
REPORT ABUSIVE REPLY
Message Subject *** Fukushima *** and other nuclear-----updates and links
Poster Handle Anonymous Coward
Post Content
Two Reactor Trips, South Texas Project (STP) and Grand Gulf

STP - On January 4, 2013, at 0941 hours [CST], Unit 2 was manually tripped after 2 shutdown rods unexpectedly dropped during monthly control rod surveillance testing. Shutdown Bank C rods were being inserted in accordance with the surveillance procedure, when 2 rods in Shutdown Bank E (D-8 and M-8) unexpectedly dropped. This met the criteria for a manual reactor trip, which was immediately performed.

Grand Gulf - Actuation of RPS with reactor critical. Reactor Scram occurred at 2337 CST 01/04/13 from 94% CTP (Core Thermal Power). The cause of the scram appears to be a Generator/Turbine trip.
[link to www.nucpros.com]
.
 
Please verify you're human:




Reason for reporting:



News








We're dropping truth bombs like it's the end of days!