Godlike Productions - Discussion Forum
Users Online Now: 2,261 (Who's On?)Visitors Today: 1,249,875
Pageviews Today: 2,086,957Threads Today: 850Posts Today: 14,890
07:55 PM


Back to Forum
Back to Forum
Back to Thread
Back to Thread
REPORT ABUSIVE REPLY
Message Subject *** Fukushima *** and other nuclear-----updates and links
Poster Handle Anonymous Coward
Post Content
INDIAN POINT NRC EVENT REPORT: MANUAL REACTOR TRIP ON LOW STEAM GENERATOR WATER LEVEL

At 1352 [hrs. EST], the Unit 2 CCR [Central Control Room] noted a trip of both heater drain tank pumps and entered Abnormal Operating Procedure 2-AOP-FW-1, 'Loss of Feedwater'. Prior to the event, Instrumentation and Controls personnel were performing testing on the heater drain tank level control system. Turbine load was reduced per plant procedures, however a manual reactor trip was initiated at 1355 due to an inability to maintain steam generator water levels.
[link to www.nucpros.com]
.
 
Please verify you're human:




Reason for reporting:







GLP