Godlike Productions - Conspiracy Forum
Users Online Now: 1,696 (Who's On?)Visitors Today: 672,603
Pageviews Today: 892,176Threads Today: 169Posts Today: 4,340
09:51 AM


Rate this Thread

Absolute BS Crap Reasonable Nice Amazing
 

Power grid outage drill in november

 
Anonymous Coward
User ID: 14929266
United States
08/17/2013 02:46 PM
Report Abusive Post
Report Copyright Violation
Power grid outage drill in november
Planning a big outage drill This november per new york times
[link to www.nytimes.com]
Simple27

User ID: 44334522
United States
08/17/2013 02:56 PM

Report Abusive Post
Report Copyright Violation
Re: Power grid outage drill in november
They will practice for a crisis unlike anything the real grid has ever seen, and more than 150 companies and organizations have signed up to participate.

“This is different from a hurricane that hits X, Y and Z counties in the Southeast and they have a loss of power for three or four days,” said the official in charge of the drill, Brian M. Harrell of the North American Electric Reliability Corporation, known as NERC. “We really want to go beyond that.”

hiding
Learn from yesterday, live for today, hope for tomorrow. The important thing is not to stop questioning.

The world is a dangerous place to live; not because of the people who are evil, but because of the people who don't do anything about it.

The difference between stupidity and genius is that genius has its limits.

You have to learn the rules of the game. And then you have to play better than anyone else.
Anonymous Coward
User ID: 45156481
United States
08/17/2013 02:59 PM
Report Abusive Post
Report Copyright Violation
Re: Power grid outage drill in november
Its far wiser to plan shortage and increase revenues than to free the world with a energy source that replicates.


"A unique thorium-fuelled Light Water Breeder Reactor operated from 1977 to 1982 at Shippingport in the USA3 – it used uranium-233 as the fissile driver in special fuel assemblies having independently movable ‘seed’ regionse. The reactor core was housed in a reconfigured early PWR. It operated at 60 MWe (236 MWt) with an availability factor of 86% producing over 2.1 billion kWh. Post-operation inspections revealed that 1.39% more fissile fuel was present at the end of core life, proving that breeding had occurred."


[link to www.world-nuclear.org]

News








Proud Member Of The Angry Mob