Godlike Productions - Discussion Forum
Users Online Now: 1,795 (Who's On?)Visitors Today: 454,953
Pageviews Today: 741,730Threads Today: 246Posts Today: 4,657
09:04 AM


Back to Forum
Back to Forum
Back to Thread
Back to Thread
REPORT COPYRIGHT VIOLATION IN REPLY
Message Subject California's Lake Oroville Main Spillway Severely Damaged/Eroded. Oroville Dam's Recently Reconstructed Main Spillway Fundamentally Flawed
Poster Handle Crunch62
Post Content
Perforation lines are speed bumps to slow down the water before it rolls off and hits the rocks.
 Quoting: Anonymous Coward 336556


Lol. Do you know what that much water does to a none-smooth service -- based on your comment you have no clue. Go take a 300 level hydrodynamics course. Or even a basic one on OCW (this one is free).
 Quoting: Anonymous Coward 21185155


even with the most recent MS patching job, DWR still
doesn't seem to understand the Physics of Cavitation.
 Quoting: freddie 0


They bolted the top of the spillway to rock. I figured those bumps were the tops of bolts. I never saw them in old footage so I figured they are new. Right? What else could it be but new bolts?
 Quoting: Anonymous Coward 73141989


Definitely the new bolts.

I can't be the only one who assumed they would have countersunk those bolt heads and grouted over them to provide a smooth surface.

I'm not an engineer, but have been building and fabricating stuff since I was ten years old and have learned by trial and error what works and what doesn't. You'd think that someone with a formal education in hydrodynamics would know what in the hell they are doing.
 
Please verify you're human:




Reason for copyright violation:







GLP