Godlike Productions - Discussion Forum
Users Online Now: 2,161 (Who's On?)Visitors Today: 1,075,761
Pageviews Today: 1,795,461Threads Today: 727Posts Today: 12,941
05:38 PM


Back to Forum
Back to Forum
Back to Thread
Back to Thread
REPLY TO THREAD
Subject HAARP / Ascension Island and The Proteus Accelerator
User Name
 
 
Font color:  Font:








In accordance with industry accepted best practices we ask that users limit their copy / paste of copyrighted material to the relevant portions of the article you wish to discuss and no more than 50% of the source material, provide a link back to the original article and provide your original comments / criticism in your post with the article.
Original Message Ascension Island, St Helena
Latitude: 7°56'24.39"S
Longitude: 14°21'29.55"W
[link to earth.google.com]
Proteus Accelerator at Montauk
Latitude: 41° 3'55.17"N
Longitude: 71°52'32.30"W

The main function of HAARP is as a component of a massive interconnected grid system...

The Fax:

N.U.S.C./N.U.M.A. J.C.S.
1455 Overlook Ave,
Washington, D.C. 33902

Office of The Director of Security

01 April 1998

To All Security Operatives, Sector EC/NE/48+I

It has been confirmed as of this date, that a failure of the H.A.A.R.P. 15-3 Proteus Unit at Ascension Island U.K. had lost it's targeting control during it's first operational trial. The accelerator was damaged at shutdown, and will not be operational until 12 June at the earliest.

This failure went undetected for approximately 17 minutes, and appears to have caused another series of dimensional rifts along the East coast of the U.S. and Southwest Africa. These dimensional rifts are x- dimensional and have a time frame of -100 million B.C. plus or minus about 20 million years.

As was the case in 1995, several predatory reptillian animals have entered our y-dimension and are as this is written, freely roaming in the Southern New York region, Northern Pennsylvania, West Virginia and a possible sighting ocurred this morning at 2:34 hours at Norfolk N.A.S. 150 meters off the beach.

All operatives are officially at level 4 alert, and are to be ready to go on 60 minute notice. (DOOTP) article 15-1 through 17-4 with all addendums are to apply.

Weapons are to be available at all times, .40 and .50 caliber minimum, with FMJ and EHP rounds only, minimum handgun to be carried .357 MAG/EHP.

THIS DOCUMENT IS EYES ONLY, DESTROY AFTER READING

Director of Field Operations,
Adm. Raymond D. Falvey III

CC: DCM/NOS/USAF/DOD/SS/QCD=Adjutant Generals Office, Pent. R-6-106/9c
All Pathway Field Officers/Terminators(orders are terminate NOSAVE)

From:
[link to www.mindcontrolforums.com]

Some background history of the Proteus projects...
Thread: Interchange Labs : A Brief History of the Project
Pictures (click to insert)
5ahidingiamwithranttomatowtf
bsflagIdol1hfbumpyodayeahsure
banana2burnitafros226rockonredface
pigchefabductwhateverpeacecool2tounge
 | Next Page >>





GLP