Users Online Now:
1,943
(
Who's On?
)
Visitors Today:
15,654
Pageviews Today:
32,469
Threads Today:
17
Posts Today:
341
12:26 AM
Directory
Adv. Search
Topics
Forum
Back to Forum
Back to Thread
REPLY TO THREAD
Subject
Question for a construction General Contractor
User Name
Font color:
Default
Dark Red
Red
Orange
Brown
Yellow
Green
Olive
Cyan
Blue
Dark Blue
Indigo
Violet
Black
Font:
Default
Verdana
Tahoma
Ms Sans Serif
In accordance with industry accepted best practices we ask that users limit their copy / paste of copyrighted material to the relevant portions of the article you wish to discuss and no more than 50% of the source material, provide a link back to the original article and provide your original comments / criticism in your post with the article.
[quote:Tynyyn:MV81MDg1NDQ4XzRCOEE1MUZD] I did a total gut and rebuild for a shower stall. After digging into the demo phase it was very apparent that termites had utterly chewed through all the existing framing studs exterior sheathing and subfloor. The total bill for just the materials was $1900. I worked six days on this project with my wife beside me doing the scutt work. How should I bill for the labor portion of this job? Total hours with a per hour rate or just match the materials cost? Thanks [/quote]
Original Message
I did a total gut and rebuild for a shower stall. After digging into the demo phase it was very apparent that termites had utterly chewed through all the existing framing studs exterior sheathing and subfloor.
The total bill for just the materials was $1900. I worked six days on this project with my wife beside me doing the scutt work.
How should I bill for the labor portion of this job? Total hours with a per hour rate or just match the materials cost?
Thanks
Pictures (click to insert)
General
Politics
Bananas
People
Potentially Offensive
Emotions
Big Round Smilies
Aliens and Space
Friendship & Love
Textual
Doom
Misc Small Smilies
Religion
Love
Random
View All Categories
|
Next Page >>