Godlike Productions - Discussion Forum
Users Online Now: 2,081 (Who's On?)Visitors Today: 754,357
Pageviews Today: 982,790Threads Today: 249Posts Today: 3,506
08:26 AM


Back to Forum
Back to Forum
Back to Thread
Back to Thread
REPORT COPYRIGHT VIOLATION IN REPLY
Message Subject *** Fukushima *** and other nuclear-----updates and links
Poster Handle Anonymous Coward
Post Content
FORT CALHOUN

Results of a thermal fatigue analysis on the Chemical and Volume Control System (CVCS) charging line concluded that the socket weld fittings above the RCS piping cannot be qualified.

As an interim action, shut down cooling purification has been secured and charging has been isolated to the RCS.

The plant is shutdown and in Mode 5 with the reactor vessel head removed, so RCS is not intact and not required to be for current plant conditions.
[link to www.nucpros.com]
.
 
Please verify you're human:




Reason for copyright violation:







GLP