Godlike Productions - Discussion Forum
Users Online Now: 1,854 (Who's On?)Visitors Today: 1,077,956
Pageviews Today: 1,884,139Threads Today: 728Posts Today: 14,515
08:33 PM


Back to Forum
Back to Forum
Back to Thread
Back to Thread
REPORT ABUSIVE REPLY
Message Subject *** Fukushima *** and other nuclear-----updates and links
Poster Handle Anonymous Coward
Post Content
POINT BEACH: UNIT 1 MANUALLY TRIPPED IN ANTICIPATION OF AN AUTOMATIC TURBINE TRIP
Unit 1 Manual Reactor Trip was initiated in anticipation of an auto turbine trip due to operators noticing the turbine governor valves closing in response to an Electro-Hydraulic Control System signal. All Control Rods are fully inserted. The RCS is being cooled by forced flow (reactor coolant pumps).
[link to www.nucpros.com]
.
 
Please verify you're human:




Reason for reporting:







GLP