REPORT ABUSIVE REPLY
|
Message Subject
|
34 days left. Urgent press release from notepad
|
Poster Handle
|
notepad |
Post Content
|
Status: 18.04.08 - Only 33 days left.
Status: 18.04.08 33 days left. www.notepad.ch Save the universe.
Timeline
ISSUE Large explosion: 2005 ISSUE Magnet failure: 2007 TEST Test Sector warmup/coopdown cycle: 2007 QA ISSUE 7 of 8 segments failed cool-down tests CANCELLED Complete warmup/cooldown cycle, Low power runs INIT System init (1. Beam injection): 21. May 2008 INIT Cold Date: 1. June 2008 DOCU New safety report not released START System activation (Circulating beams): July 2008 PROD System ready: October 2008 EXPERIMENT Protons used: 15. June 2008 HIGH RISK EXPERIMENT Elevated black hole risk: 21. December 1212
Important note: These are not official dates. No official dates where available to us yet. CERN should publish them. These dates are based on news, opinions and insider info. Additionally, I try my best. I am not a scientist - just a citizen. I will update this information and all information on www.notepad.ch as soon as new information becomes available. The blogs at www.notepad. have been created on the 14 of April, that is the date I realized that the black hole danger at the CERN's LHC is for real. My goal is to let you decide if there is an issue with the 'go to prod' of the LHC - or not. That is the reason this site consists just of News, opinions, forum messages etc. I always named the source of the quote, did mention in each article that this is a quote from etc. My assumption is that this is the legal and fair way to quote without changing the context. Please tell me if I am wrong and I will immediately correct it. Thank you.
|
|
Please verify you're human:
|
|
Reason for reporting:
|